"Add 1 door to Suite 200." Quoted from what is already on the wall.Coming soon
LV Dispatch reads the site's controllers, ports, power and standards, picks the open port, builds the bill of materials and sends a quote the customer can sign.
One line in, matched to the site
Type the request or send it from a service call. LV Dispatch matches it to the site and pulls the access control record.
- Typed, from a call, or from a tech note
- Matched to site, floor and suite
- Existing system loaded from the site record
"Add 1 door to Suite 200 office."
System
| Controller | Mercury LP1502 |
| Downstream | 3 × MR52 · RS-485 |
| Doors | 6 of 8 reader ports used |
| Readers | HID Signo 20 |
Also from the record
Suite 200 entry · existing door on MR52 #2
As-built floor 2 · IDF closet B
Last service Aug 2024
Find the open port before anyone climbs a ladder
LV Dispatch maps every reader port and I/O point on the controller and downstream boards, checks power, and picks the best open port.
- Every reader port: used or open
- Inputs and relays for DPS, REX and lock
- Lock power and battery load
- Chosen port with the reasoning
Power · IDF closet B
| Lock PSU | Altronix AL600ULACM · 6 A |
| Load now | 2.75 A |
| With new door | 3.25 A · 54% |
| Battery | 2 × 12 Ah · 4 hr standby ok |
Why MR52 #2 reader 2
Closest panel: IDF closet B is ~85 ft from Suite 200 on the as-built.
Free I/O: 5 inputs and 5 relays open for DPS, REX and lock.
Power headroom: 54% of PSU after the new strike.
Same floor: no riser penetration.
| MR52 #2 point | Use | Status |
|---|---|---|
| Reader 2 | Suite 200 office · Signo 20 | Assign |
| Input 3 | DPS · Suite 200 office | Assign |
| Input 4 | REX · Suite 200 office | Assign |
| Relay 2 | Strike · fail-secure | Assign |
Bill of materials from your site standards
Same reader as the other doors, your lock choice, cable lengths from the as-built distance, and labor by task.
- Site-standard reader and hardware
- Strike or maglock option
- Cable estimated from floor plan distance
- Labor hours by task
| Material | Qty | Basis |
|---|---|---|
| HID Signo 20 reader | 1 | Site standard |
| HES 9600 electric strike, 12/24 V | 1 | Site standard |
| Recessed DPS | 1 | |
| REX motion sensor | 1 | |
| Composite cable, 18/6 · 22/6 · 22/2 | 110 ft | 85 ft path + 25 ft slack |
| Wire, junction box, labels | 1 lot |
Labor by task
| Pull cable IDF B to door | 2.0 hr |
| Frame prep and strike install | 1.5 hr |
| Reader, DPS, REX mount and terminate | 1.0 hr |
| Panel terminate and program | 0.75 hr |
| Test and handover | 0.5 hr |
| Total | 5.75 hr |
A clean quote the customer can sign
Line items, quantities, labor, good and better options, terms and e-sign in one link.
- Line items and labor
- Good and better options
- Your terms
- Approve and sign online
| HID Signo 20 reader | 1 | $318.00 |
| HES 9600 electric strike | 1 | $412.00 |
| Door position switch | 1 | $24.00 |
| REX motion sensor | 1 | $96.00 |
| Cable and materials | 1 | $148.00 |
| Installation and programming | 5.75 hr | $690.00 |
| Total | $1,688.00 |
50% deposit to schedule, balance on completion. Quote valid 30 days. Hardware warranty per manufacturer; labor warranted 1 year.
Signed quote becomes a ready job
The call sheet is pre-filled with the port assignment, parts are reserved or ordered, and the site record updates after install.
- Call sheet with port and I/O pre-filled
- Parts reserved or ordered
- Site record updated after install
- Port now shows as used
Call sheet · pre-filled
| Port | MR52 #2 · reader 2 |
| DPS / REX | Inputs 3 and 4 |
| Lock | Relay 2 · fail-secure |
| Power | IDF B · AL600ULACM |
Parts
Reserved Signo 20 · warehouse
Ordered HES 9600 · due Oct 30
On truck DPS, REX, cable
After install · site record
Your next truck roll should know what it's walking into.
Set up LV Dispatch yourself today. Free plan, no implementation fee, no card.